Concrete Bridge
Prestressed CFRP Systems
After strengthening with prestressed carbon plates, the load level was increased from steam 20 to highway level 1, and the load test showed that it met the current load requirements.
This bridge is a concrete slab bridge built in the 1980s, with low design standards, poor construction quality, particularly severe diseases, and pre demolition and reconstruction;
After strengthening with prestressed carbon plates, the load level was increased from steam 20 to highway level 1, and the load test showed that it met the current load requirements.