Steel Plate Reinforcement At The Bottom Of The Overpass Bridge

Under the circular ramp of the overpass, a long steel plate is installed at the bottom of the box girder, which is fixed with rivets to reinforce the box girder.

下载.jpg

A viaduct that has been in service for nearly 25 years


The elevated bridge has been built for over 20 years, but due to changes in load and overloading during use, it has caused some damage to the bridge structure.


Under the circular ramp of the overpass, a long steel plate is installed at the bottom of the box girder, which is fixed with rivets to reinforce the box girder.


Steel Plate Reinforcement At The Bottom Of The Overpass Bridge

Steel Plate Reinforcement At The Bottom Of The Overpass Bridge


The products used in this casePeople who browsed this project also concern these products:

Back
Top
Close