Large Workshops Renovation And Reinforcement
Adhesive Steel Plate Glue
In order to ensure the safety of the building structure after the demolition and modification, the components that do not meet the safety requirements should also be reinforced during the demolition and modification.
The construction plant is a four-story reinforced concrete structure, 27 meters high, with a total area of over 16,000 square meters. Since Party A plans to add a production line and a freight elevator, and the production line is as high as 20 meters, it is necessary to demolish and modify the 2-4 floors of the existing factory building. In order to ensure the safety of the building structure after the demolition and modification, the components that do not meet the safety requirements should also be reinforced during the demolition and modification.